Westside Bikeway - SA

Suitable For: Cycling/MTB 
Distance: 8.6km
Submitted By: Member - Wade T
Submitted: 21 Dec 2025

Description

The path follows a former railway line that went from the North Terrace railway station to Glenelg. Most of the trail follows the linear park, with some shady trees, playgrounds and a dog park. The first 1.9km of the trail from Mile End follows James Congdon Drive before reaching South Road and start of the linear park. The trail ends after reaching Camden Oval, where the trail leaves the route of the former railway and meets up with Anzac Highway, connecting with the Mike Turtur Bikeway, which follows the tramline and continues a further 1.5km to Glenelg, and also the Sturt River Linear Park which heads south-east.

The trail is a shared use trail, for cyclists and walkers. The trail is a bitumen surface, wide and flat. The trail is suitable for people with mobility access, including wheelchairs, prams and cyclists. The trail is well lit after dark.

Suitable For: Cycling/MTB 
Distance: 8.6km
Submitted By: Member - Wade T
Submitted: 21 Dec 2025
Num Points: 1081
Accuracy: Very High
RouteID107414
iMapPlot Reference Image

Weather

Closest Weather Station

Mount Lofty at 22/11:30am CDT
Distance from Midpoint 16.11km E
TemperatureFeels LikeRel. HumidityDew PointPressureRainfallWind DirectionWind SpeedGusts
12.6°C10.8°C69%7.1°ChPa0.0mmW6km/hr
3knots
9km/hr
5knots

Closest Climatic Station

Adelaide Airport
Distance from Midpoint 2.6km NW
 JanFebMarAprMayJunJulAugSepOctNovDec
Mean Max. °C28.128.125.422.218.515.914.915.918.221.023.925.7
Mean Min. °C15.916.114.411.89.57.67.07.58.910.612.814.5
Mean Rain mm17.418.122.135.154.056.658.850.345.637.525.124.0

Comments & Reviews

Post a Comment
Loading...
Status:Locked. Cannot be accessed by others. Shareable. Can only be accessed via link. Open. Can be viewed by anyone.
Download Track Log

Sponsored Links